Question1: Which mhetods are available for goods issue posting of material components for process orders?

Question2: How can you carry out cost object controlling for production orders?

Question3: You have a schedule agreement whit a vendor. You want classic MRP to automatically create schedule lines in case of material shortage.
What must you do?

Question4: What happens to this dependent requirement when you convert the planned order into a production order?

Question5: Your project used process orders for the production of liquid chemicals.
What can you define to ensure that the production flow happens only in physically connected tanks?

Question6: In your plant, MRP is activated.
Which option do you have to exclude a materila from the MRP run?

Question7: You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?

Question8: Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?

Question9: Which of the following elements does MRP take into account during net requirement calculation?

Question10: What are the consequences when you assgn a planned order to a production line manually, using the planning table in repetitive manufacturing?

Question11: What does it mean for the production planner when MRP works with infinite capacities?

Question12: Which actions does the system preform by default when you save a confirmation for a finished product in repetitive manufacturing?

Question13: Which business processes are affected by setting in the order type-dependent parameters?

Question14: You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

Question15: Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?

Question16: Which of the following are possible configuration steps when setting up the alert monitor in Advance Planning?

Question17: How would you define pegging in the context of Advanced Planning?

Question18: Which item statuses can you select inside a material BOM?

Question19: In the Schedule Production app which setting can you make for the planning strategy?

Question20: Your proyect team decides to use a make-to-order planning strategy for strategic in discrete manufacturing.
What is the impact of this decision?

Question21: How can you achive a feasible production plan in case of capacity constraints?

Question22: Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider?

Question23: Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing?

Question24: Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?

Question25: Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.

Question26: How can you limit the validity of a bill of material (BOM)?

Question27: An issue storage location was NOT found through the work center, bill of material(BOM) item, or material master. What determines whether the storage location can be derived from the production version?

Question28: What are some uses for the low-level code assigned to each material?

Question29: Which SAP application can be used for forcasting in Supply Chain Planning?

Question30: Your quality department detect a deviation in a raw material batch. Unfortunately, this batch has already been used in producion. How can you indentify all affected finish goods stocks?

Question31: What could be the reason for multiple commitment of invidula capacities, where several operations have the same scheduled dates on a work center (or resource) after planing?