Question1: You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible. Which settings do you make to achieve this?

Question2: You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?

Question3: What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?

Question4: You have a quality control check to avoid using a high-value component tin faulty materials in subsequent assembly operations. How do you account for potential scrap of the high-value material?

Question5: What are properties of MRP Live? There are 2 correct answers to this question.

Question6: Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers tothis question.

Question7: An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. Whatdetermines whether the storage location can be derived from the production version?

Question8: What is a work center hierarchy in SAP S/4HANA capacity planning?

Question9: What data processing steps are obsolete if you use SAP S/4HANA Analytics? There are 2 correct answers to this question

Question10: The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings? Please choose the correct answer.

Question11: Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note:There are 2 correct answers to this question.

Question12: What are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 3 correct answers to this question.

Question13: You want to schedule an order in the graphical planning board. What are valid planning directions?
There are 2 correct answers to this question.

Question14: In Make-to-order production, which field controls whether the components will be planned as sales order specific stock?

Question15: Advanced Planning uses master data and transaction data from SAP S/4HANA In which data obje can you set the advanced planning flag? Note: There are 2 correct answers to this question.

Question16: In which customizing activity do you set up automatic routing selection production orders?
Please choose the correct answer.

Question17: The MRP run detected a shortage of a material that you source from an external supplier in full pallets. How can you make sure you will only receive full pallets?

Question18: The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging?

Question19: A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system.
Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?

Question20: How can you set up the supply source for the SAP Kanban process? Note: There are 3correct answers to this question.

Question21: Which options are available for an SAP S/4HANA deployment? There are 2 correct answers to this question.

Question22: Which SAP solutions can be used for forecast ng in Supply Chain Planning? Note: There are 2 correct answers to this question.

Question23: During planning you are facing an overload situation on a resource. Which activities do you consider to create a feasible production plan? There are 3 correct answers to this question.

Question24: Which of the following business processes are controlled by parameters that are dependent on production order type? Note: There are 2 correct answers to this question.

Question25: How would you define pegging in the context of Advanced Planning?

Question26: What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? Note: There are 2 correct answers to this question.

Question27: Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? Note: There are 3 correct answers to this question.

Question28: Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider? Note: There are2 correct answers to this question.

Question29: You are transferring data from SAP S/4HANAIo embedded PP/OS. What master data objects are mapped to a location? There are 3 correct answers to this question.

Question30: Which of the following is a valid sequence of the main activities in product on order processing?

Question31: At the end of the MRP run you receive the exception message "Reschedule In Operation". What caused the message to be generated?

Question32: You want to triggering-houseproduction of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

Question33: Which advanced functionality has been embedded in SAP S/4HANA? There are 3 correct answers to this question.

Question34: What are the possible results of a production planning run inAdvanced Planning (PP/OS)? Note: There are 3 correct answers to this question.

Question35: When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?

Question36: What do you use to schedule operations from planned orders so that the production plan can be fulfilled?

Question37: What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS?
There are 3 correct answers to this question.

Question38: In a production process, you need acertain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?

Question39: MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?

Question40: Where do you maintain the duration of a producton operation?

Question41: In your project,you have several materials that are planned by different people. How can you assign the planning responsibility?

Question42: What are the consequences if operation status Dispatched is set for a production order operation?

Question43: What is the purpose of collective orders?

Question44: Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.

Question45: Which time elements can be reduced by a reductionstrategy? Note: There are 3 correct answers to this question.

Question46: When do you use variant bills of materials (BOMs)?

Question47: Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.

Question48: How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.

Question49: For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.

Question50: Which time elements are relevant for lead t me scheduling of a product on order? Note: There are 2 correct answers to this question.

Question51: In which of the following master data objects can you define the production order default storage location for a material component? There are 2 correct answers to this question.

Question52: The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan? There are 2 correct answers to this question.

Question53: Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.

Question54: Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.

Question55: You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?

Question56: What are examples of assignment objects you can maintain in the Engineering Workbench?
There are 3 correct answers to this question.