Question1: What must be used in the system to plan the requirements for different subcontractors separately?

Question2: When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?

Question3: In a production process, you need a certain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?

Question4: Which transaction code can you use in SAP S/4HANA to enter and display goods movements?

Question5: Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.

Question6: Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? Note: There are 3 correct answers to this question.

Question7: What determines whether the planned independent requirements in MRP consume other requirements?

Question8: You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: There are 2 correct answers to this question.

Question9: You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them automatically copied to production orders?
There are 2 correct answers to this question.

Question10: You are transferring data from SAP S/4HANAIo embedded PP/OS. What master data objects are mapped to a location? There are 3 correct answers to this question.

Question11: You need to model goods receipt processing time in Detailed Scheduling. Which modelling options do you have? Note: There are 2 correct answers to this question.

Question12: What does a line hierarchy in repetitive manufacturing represent?

Question13: You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

Question14: For what production type are production orders used?

Question15: Which of the following is a valid sequence of the main activities in product on order processing?

Question16: You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? Note: There are 2 correct answers to this question.

Question17: What are the consequences if operation status Dispatched is set for a production order operation?

Question18: You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this?

Question19: What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? Note: There are 2 correct answers to this question.

Question20: What is a work center hierarchy in SAP S/4HANA capacity planning?

Question21: What are drawbacks of the separation of OLTP and OLAP? There are 4 correct answers to this question.

Question22: When do you use variant bills of materials (BOMB)?

Question23: What data can you maintain in the sub items of a bill of material (BOM)? Note: There are 2 correct answers to this question.

Question24: What are some of the advantages of using Kanban? There are 2 correct answers to this question.

Question25: What are some uses for the low-level code assigned to each material? Note: There are 2 correct answers to this question.

Question26: Which data model changes have been implemented in Sales and Distribution? There are 3 correct answers to this question.

Question27: What does it mean for the production planner when MRP works with infinite capacities?

Question28: In which data object is the production line (Repetitive manufacturing relevant work center) maintained?

Question29: Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.

Question30: What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.

Question31: What is the difference between co-products and by-products?

Question32: Your client is asking for your advice on material master numbering in SAP S/4HANA.
What do you need to consider? Note: There are 2 correct answers to this question.

Question33: In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?

Question34: How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.

Question35: What is the first step in the MRP run?

Question36: In which data objects do you maintain the production line as the work center for repetitive manufacturing? Note: There are 2 correct answers to this question.

Question37: What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.

Question38: You are creating a production order manually. What activities are involved in this process?
There are 3 correct answers to this question.

Question39: What are the possible results of a production planning run in Advanced Planning (PP/OS)? Note: There are 3 correct answers to this question.

Question40: You want to integrate an existing planned order into Advanced Production Planning. Which report do you use? Please choose the correct answer.

Question41: Which time elements are relevant for lead t me scheduling of a product on order? Note: There are 2 correct answers to this question.

Question42: Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?

Question43: What new technology is used in SAP S/4HANA Embedded Analytics? Please choose the correct answer.

Question44: What are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 3 correct answers to this question.

Question45: How can you set up the supply source for the SAP Kanban process? Note: There are 3 correct answers to this question.

Question46: You have a quality control check to avoid using a high-value component tin faulty materials in subsequent assembly operations. How do you account for potential scrap of the high-value material?

Question47: How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.